Building Project Priorities

High

  • Boiler Control Panel

  • LED Lighting

  • Solar Panels

  • Sanctuary Flooring

  • Fire Panel/Sprinkler

  • Floor Framing Repairs

  • Parking Lot, Repair, Seal Coat, Stripe

  • Replace Shingle Roofing

  • Audio/Video Upgrade

  • Replace Concrete Platform/Stairs

  • Scrape/Prime/Paint Exterior
  • Carpet Replacement – Sanctuary

Medium

  • HVAC Installation – Music Wing
  • Carpet Removal/Flooring Refurbish – Music Wing 
  • Pad and Upholster Pews
  • Remodel Bathroom/Below Stairs
  • Remove and Replace Flooring – Chapel
  • Remove Siding/Reside – Steeple
  • Repair Front Steps and Railing – Sanctuary Entrance 
  • Repair Interior Steeple
  • Sidewalk Replacement – North Side along Sanctuary 
  • Hardboard Siding Repair
  • Replace Soffit and Facia

Low

  • New Risers for Music Department
  • Remodel Old Fellowship Hall L-21
  • Replace Overgrown Arborvitae